FIRM’S EXPERIENCE |
|||||||||||
(GENERAL EXPERIENCES OF THE COMPANY WITHIN THE LAST SEVEN YEARS) |
|||||||||||
CIRIAJASA ENGINEERING CONSULTANTS |
|||||||||||
No |
Name of Employer/ Client |
Contract of works/Services/assignments |
Period of contract |
Value of Contract |
Company’s sharing value |
||||||
Contract Number and Date |
Title of works/ services/assignments |
Brief description of works/services/ assignments |
Start date |
Completion date |
|||||||
[dd-mm-yy] |
[dd-mm-yy] |
[Equiv. US$] |
[Equiv. US$] |
||||||||
1 |
Dir Jen BPPSPAM DEPARTEMEN PU / APBN |
KU.08.08/01-PC/PPK-III/BPPSPAM/VI/2008 June 06, 2008 |
Technical Assisstance for Heathy of PDAM (PC-1) |
This activity is "TRAINING" to comprehend procedure compilation of Financial Report and Performance Report of PDAM-PDAM chosen as according to principles in regulation so that the report’s become to be made an audit, hence especial activities to be done by Consultant is; 1. Identifying Requirement Of Training; 2. Design GBPP ( Outline Program Training); 3. Development Of Module Training 4. Management Of Training 5. Evaluation Training. |
6-juni- 2008 |
5-des-2008 |
84,991.70 |
84,991.70 |
|||
2 |
Kementerian Negara Koperasi dan Usaha Kecil dan Menengah, APBN |
126.3/SPK/DEP.5/VII/2008 July 14, 2008 |
Gerakan Tunas Kewirausahaan Nasional Bagi Pemuda Putus sekolah |
of training by taking model " Values Based training", that is training model is method of based on effort of transformation especial values. This training target is strategic group of religious and social institute of young man, with step as; 1. Recruitment training participant 2. Stipulating of content and execution of training 3. Evaluate execution of training which consist of evaluation content absorption and evaluation to training itself. |
14-Juli-2008 |
10-nov-2008 |
67,563.16 |
||||
3 |
Public Work Agency of East Tanjung Jabung District/ APBD |
050/21SPK/PRC/DPU/TJT/2008 June 16, 2008 |
(DED) Development of East Tanjung Jabung District Water Supply Distribution |
1) Conducting field (topography) survey 2) Compilation of detail plan, coverage : plan drawing, cost estimate of onstruction, Tender Document, RFP, documentation and reporting | 16-June-2008 |
15-Des- 2008 |
106,396.00 |
106,396.00 |
|||
4 |
Ministry of Disadvantaged Areas |
82/KTR/P2DTK/V/2008 May 5, 2008 |
Support for Poor and Disadvantaged Areas (P2DTK)) |
Ministry Of State Development of Disadvanteg Area in this case Disadvanteg Area and Special Development Program wish to create Consultant Management in National level, Province, Sub-Province and District (Kecamatan) according to its function capable to execute Program of P2DTK by effisien and effektif. | 5-Mei- 2008 |
5-
Oct-2008 |
404,987.89 |
404,987.89 |
|||
5 |
Directorate General of Power and Energy Exploting |
SPK-08/JK.III/P2K.NF/ VI/2007 18 Juni 2007 |
Audit of Energy in Industrial Fertilize and Chemical Sector |
1). Doing survey to determine fertilizer industry and chemistry 2) doing study to used power plant 3) economic evaluation of power plant performance system 4) giving suggestion to efficiency usage of energi. | 18-Jun-2007 |
18-Des- 2007 |
410,461.31 |
410,461.31 |
|||
6 |
Local Government Of Rejang Lebong District |
30/SPAM/PPDAM/RL/2007 2 Okt. 2007 |
Detail Engineering Design Kota Curup |
1).Conducting field survey 2) Compilation of detail plan; coverage: plan drawing, cost estimate of construction, document of tender, RFP, documentation and reporting 3) Assisting committee auction in execution | 2-Oct-2007 |
15-Dec-2007 |
48,493.18 |
48,493.18 |
|||
7 |
Local Government Of Rejang Lebong District |
31/SPAM/PDAM/ RL/2007 |
Detail Engineering Desain IKK Sindang kelingi,IKK Binduriang,IKK Padang Ulak Tanding, IKK Selupu Rejang, IKK Bermani Ulu, IKK Sindang Beliti, IKK Sindang Dataran |
1).Conducting field survey 2) Compilation of detail plan; coverage: plan drawing, cost estimate of construction, document of tender, RFP, documentation and reporting 3) Assisting committee auction in execution of auction. | Nov
06, 2007 |
Dec.
15 2007 |
80,852.94 |
80,852.94 |
|||
8 |
Local Government of Kota Depok |
602/33/VII/DPU/2007 17 Juli 2007 |
Detail Engineering Desain of Roads Area Improvement Project |
(1) Assisting in execution of quality,technical planning standard, technical specification from contract document; (2) Assisting in review design executed by contractor (if any) (3) Checking and guarantying that result of work of field executed accurately and correctness; (4) Ensuring that all report can be finished on schedule and load all progress note and also something else matter related to project | Jul
17, 2007 |
Sep.17, 2007 |
26,328.11 |
26,328.11 |
|||
9 |
Departemen of Public Work |
KU.08.08/05-PC/PPK-PEKP/BPPSPAM/VI/2007 12 Juni 2007 |
Evaluation Sanitation Integrity In Development Of SPAM ( PC 5) |
Compiling Concept of Sanitation Integration Development and SPAM, covering 3 (three) aspect that is : Management aspect, Technical aspect, and Monetary aspect. | 12-Jun-07 |
12-Dec-07 |
73,968.04 |
73,968.04 |
|||
10 |
Departemen of Public Work |
KU.08.08/SPK/SNVT-BINTEK PLP/III/PK-3/2007 15 Maret 2007 |
Techical Assistance Compilation OF SPAR Continuation City of NUSSP Regional I |
Scope of Service from consultant in this activity is (1) preparing survey instrument with review indicator stipulating of Kota/sub-province target which have been used by NUSSP-1; (2) review Kota/sub-province objectives result identify Kota/sub-province location of NUSSP replication continuation pursuant to RP4D which have been compiled by sub-province / Kota (3) Road Show to Kota/sub province result of identifying; (4) compilation of Sub-Project Appraisal Report (SPAR) | 15-Mar-07 |
15-Dec-07 |
91,614.24 |
91,614.24 |
|||
11 |
Local Government Of Rejang Lebong District |
05/SPP/MPPDAM/2006 20 Nop. 2006 |
Master Plan for Water Supply System Development at Rejang Lebong District, FY. 2006 |
(1). Optimalization of clean water asset; ( 2) Improving service with pattern integrity of area; ( 3) Compiling alternatives system development of competent clean water network; ( 4) Calculating estimate of invesment expense for construction; ( 5) economic and technical Program for the development during 10 year or up to year 2017, including making of first phase plan required during 5 year that is up to year 2011. | 20-Nop- 2006 |
19-Dec-2007 |
45,647.06 |
45,647.06 |
|||
12 |
Ministry of Public Work |
HK.08.08/KMW-XIV/IBRD-IDA/SNVT-PKP/P2KP-3/564/2007 April 27, 2007 |
Oversight Consultant (OC) Third Urban Poverty Project (UPP3) Package 14-Region XIV North Maluku IBRD Loan 4779-IND and IDA Cr. 4063-IND |
a.) Improved the community development in urban area trough deliver micro credit for community participation group (KSM; b.) Developed strategic economic program for community development.; c.) Designed alternatives potential and prospective of economic development plan; d) Facilitated community participation group (BKM/KSM) to create small-scale business development; e). Assessment and review of the training program; f). Created advertisement of urban poverty thought leaflet and television broadcasting | 27-Apr-07 |
27-April- 2009 |
1,899,778.74 |
1,139,867.24 |
|||
13 |
Ministry of Disadvantaged Areas |
119/KTR/P2DTK/VI /2007 |
Consulting Services of Support for Poor and Disadvantaged Areas |
a. Compiling of training Module; b. Ready of Coach; c. Managemenet Trainig; d. Report of Management Training | July
22, 2007 |
Sept
22, 2007 |
358,212.35 |
||||
14 |
Sustainable Capacity Building for Decentralization Project, Local Government of District Garut |
05/PIU-SCBD/I/2006 January 23, 2006 |
Implementation of Capacity Building Action Plan (CB-AP) in Garut District of Sustainable Capacity Building for Decentralization (SCBD) Project Package C.2 ~ ADB Loan No. 1964-INO |
(a) Develop Capacity Building Action Plan (CB-AP) and strategy of the local government to support sustainable capacity building; (b) Improve adequate capacity of human resource to fulfil decentralized government needs; (c) Develop training system, assessment, and improved curriculum that meet the requirement of decentralized local government; (d) Develop financial management which ensure sustainable capacity building at local level; (e) Gender mainstreaming program to aware potential result and impact of gender equality policy; and (f) Develop policy and main supporting activities that allow improvement of local capacity in sustainable ways; (g) Providing reference for local government in activity allocation and budget to support the improvement of area autonomy execution | Jan
23, 2006 |
January
23, 2008 |
1,257,944.38 |
1,257,944.38 |
|||
15 |
Ministry of People Housing, Task Force of Capacity Building of Human Resources, Operationalization of Self Housing Policy |
177/SPK/PK-OKPS/2006 |
Conception for Facilitating for Research and Development Products of Social, Economy & Culture, and Precise Technology Utilize in Self Housing Development |
a). identify the research & development products of social, culture, and precise technology utilize of self housing development, (b) identify the need of facilities and utilization of research and development products of social, culture, and precise technology utilize, (c) Identify and formulates the problems of utilization of research and development product of self housing providing, d) makes alternative problems solving of utilization of research and development products of self housing providing, (e) makes academic conception for guidelines of facilitating for utilization of research and development products to self housing providing | June
23, 2006 |
Des
20, 2006 |
36,571.76 |
36,571.76 |
|||
16 |
Ministry of People Housing |
HK.02.07/PKPK/85 /06 |
Technical Assistance for Planning of Housing & Settlement Development at District (RP4D) |
(i) Identify the strategy and policies on housing and settlement planning, (ii) Identify accordingly housing & settlement sector development to their policies, (iii) Identify map of problems of housing and settlement development, (iv) Makes database and basic information to support urban housing and settlement development, (v) Identify the model of handling to land using to urban housing & settlement, (vi) makes out line planning of development and strategy of housing and settlement handling, (vii) Identify the priorities scale of housing and settlement development, (viii) Makes the detail planning of urban settelment development, (ix) facilitate the stakeholders in order carry out the RP4D | 8-May-06 |
10-October-2006 |
31,158.47 |
31,158.47 |
|||
17 |
Ministry of People Housing, Task Force of Capacity Building of Human Resources, Operationalization of Self Housing Policy |
168/SPK/PK-OKPS/2006 June 21, 2006 |
Training of Trainers (TOT) for Model Implementation of Self Housing Development |
a). to identify training needs for model implementation of self housing; b). to prepare TOT material, covers syllabus and training modul for model implementation of self housing; c). identify the target groups; d). Delivery of TOT in Jakarta as refference for each local governments; e). Monitoring and training evaluation; f). to give recommendation on Grand Strategy for institutionalization of Self Housing delivery | 21-Jun-06 |
20-Dec-06 |
65,318.65 |
65,318.65 |
|||
18 |
The Ministry of Public Work, Directorate General of Human SettlementThe Ministry of Public Work, Directorate General of Human Settlement |
04/KTR-KPD-AN/IX/2006 |
Standard of Position Competencies of Task Forces of Directorate General of Human Settlement |
a). Position Analysis. On this stage carried out review of Guidelines Analysis Position based on decree Ministry of State Aparatus Utilizzation No. KEP/61/M.Pan/6/2004, b.Position Competencies Assessment. On this stage carried out desk study aboout competencies theory, includes compilation technique of of Structural Position Competencies Standard base on letter of State Officer Bureau No. 46A Tahun 2003 and identify the competencies parameters related with task force of Directorate General of Human Settlement; c. Data Collecting Forms Compilation; d. Survey and Data Collecting; e. Data Tabulation and Compilation; f. Workshop Delivery; g. Compilation of Position Ccompetencies Standard of Task Force in Directorate General of Human Settlement. | 15-Sep-2006 |
15-Des- 2006 |
36,571.76 |
36,571.76 |
|||
19 |
Ministry of People Housing, Task Force of Capacity Building of Human Resources, Operationalization of Self Housing Policy |
177/SPK/PK-OKPS/2006 |
Conception for Facilitating for Research and Development Products of Social, Economy & Culture, and Precise Technology Utilize in Self Housing Development |
a). identify the research & development products of social, culture, and precise technology utilize of self housing development, (b) identify the need of facilities and utilization of research and development products of social, culture, and precise technology utilize, (c) Identify and formulates the problems of utilization of research and development product of self housing providing, d) makes alternative problems solving of utilization of research and development products of self housing providing, (e) makes academic conception for guidelines of facilitating for utilization of research and development products to self housing providing | 23-Juni- 2006 |
20-Dec-06 |
68,687.88 |
68,687.88 |
|||
20 |
DGWR, Dep. Of Public Work |
KU.08.08-Aa.10.04/829 14 Juni 2006 |
Detail Engineering Design Ciawi Dam, Stage III |
Compilation of detail Engineering design to prepare of Ciawi Dam Stage III, to be functioned for the requirement of control and operation of floods and also requirement of agriculture farm irrigation. | Jun 14, 2006 |
Dec 14, 2006 |
180,302.94 |
72,121.18 |
|||
21 |
Kementerian Pembangunan Daerah Tertinggal (PDT) Jl. Abdul Muis No. 7 Jakarta Pusat |
419.6/KONTRAK/KOM-PDT/VIII/2005 |
Socialization of Distribution System Program of Good Supplies by Middle & Small Business and Cooperation (UMKM) in Disadvantages Area |
- | Conducting of socialization system principal goods distribution of requirement of fundamental by UMKM in 6 province | August 8, 2005 |
Dec. 8, 2005 |
141,205 |
141,205 |
||
- |
Training apply of principal goods distribution system by UMKM area in covering 6 province | ||||||||||
- |
Compiling socialization report apply of goods distribution system requirement of fundamental by UMKM in left behind area | ||||||||||
22 |
Badan Pengendalian Lingkungan Hidup Daerah (BPLHD) Jl. Naripan No. 25, Bandung, Jabar |
6021/BPLHD/WJEMP/16/2003 |
Western Java Environmental Management Project (WJEMP) Loan No. 4612-IND Credit No. 3519-IND |
- | Accountable for manual and implementation guidance CEF WJEMP | 26-Mei-2003 |
25-Jul-2004 |
375,775 |
225,465 |
||
- |
Program preparation of CEF and discussion with technique team of project | ||||||||||
- |
Assisting and preparing draft of concept and also control execution of project CEF with better | ||||||||||
- |
Making formulasi strategy to get loan of bank donor and also society other | ||||||||||
- |
Assisting to define type of project of CEF with correct , target group , technical specification outline and estimate the required which expense | ||||||||||
- |
Preparation of workshop concept and integration with training program and project simulation or pilot of project and also discussion with technical team / executor team | ||||||||||
23 |
Proyek Peningkatan Pendidikan Dasar Jakarta, Dikdasmen, Depdiknas, Jl. Jend. Sudirman, Senayan |
385/PJ/BEP-I/V/2003 |
Technical Assistant for School Building design & Construction Management for Basic Education Project |
Strengthening and assist PPCU/ DPIU in arranging work rehabilitation, work along with Unit Levying, Construction and related better with units other , and Consultant Giving facility, assisting and School Rehabilitation Team supervision in conducting works rehabilitate successfully at 118 school selection in Province Banten , as according to guidance of rehabiltasi which have been agreed. Consultant base on PPCU , DPIU and level of school | 26-05-2003 |
7/25/2004 |
197,739 |
1,581,991 |
|||
24 |
Kementerian Pembangunan Kawasan Timur Indonesia |
20-12/KPTS//PRO-PWPM- KTI/VI/2003 |
Formulation of Policies for People Normalization, Rehabilitation, and Reconciliation at Maluku and North Maluku |
- | Study concerning policy of reconsilisasi, rehabilitate and society life normalization Maluku and North Maluku of which activity is doing by related sector | 12/Jun/2003 |
12/Des/2003 |
58,269 |
58,269 |
||
| - | Conducting study formulation of policy inwroughtly reconciliation, rehabilitation, and life normalization of Maluku society and North Maluku for the completion of next activity | ||||||||||
| - | Preparing inwrought policy concept reconciliation, rehabilitate and life normalization of Maluku society and North Maluku | ||||||||||
25 |
Ministry of Kimpraswil |
02/CTR - PKSDM/2003 |
Capacity Building in Urban Engineering Training (UET) TOR 46 B ADB Loan No.1572-INO |
- | Collaboration with TOR 46 / Module Arrangement in data identification and issues related to sectors of Water Supply, Solid Waste, Liquid Waste, Drainage and Urban Road, joint with TOR 46 in preparation to arrange Module of Broad Line of Training Program and collecting Target Group for OJT Training | May 20, 2003 |
Nov. 30, 2003 |
209,591 |
125,755 |
||
| - | To assist giving inputs in Broad Line of Training Program of OJT Module (GBPP Module OJT) arrangement that to be part of TOR 46 of activity; 3).To attend Workshop of Broad Line of Training Program of Module (GBPP Module ) Socialization in 6 (six) cities of OJT performer | ||||||||||
| - | To established target group which will attend Socialization and Training of OJT in 6 (six) cities + 2 (two) cities of addition | ||||||||||
| - | To implement OJT Training in 6 (six) cities + 2 (two) cities of addition | ||||||||||
| - | To arrange Socialization and OJT of Report | ||||||||||
| - | To compile Interim Report, Final Draft and Final Report | ||||||||||
26 |
Proyek Irigasi dan Rawa Andalan Sumatera Barat, Dirjen SDA; Departemen Kimpraswil |
KU.06.08/05/IRASB-BP3/VII/2003 Juli 2003 |
Survey Investigation and Design (SID) Panti Rao Irrigation Area and Batang Tongar Irrigation Area |
To extend agriculture area in Pasaman District, Irrigation & Swam Project West Sumatera, Directorate General Water Resources, Department of Public Work, compiling planning of irrigation network detail, recognized with Panti Rao and Batang Tongar Irrigation Area. This work covers execution of field survey, detail planning compilation, expanse planning and preparation of tender document. | 'July 2003 |
'Dec. 2003 |
164,517.65 |
65,807.06 |
|||
27 |
Ministry of Kimpraswil |
11/CTR-PKMK/2002 |
Training Strategy & Training Delivery in Urban Infrastructure Management in Sumatera Region Capacity Building Urban Infrastructure Management (CBUIM) Project ADB Loan No.1572-INO |
- | Consultant reviews and develops training moduls for local requirement, and develops training sylabus | 1-Jul- 2002 |
Dec 15, 2002 |
503,912 |
302,347 |
||
| - | To prepare training material and supporting equipment | ||||||||||
| - | To select the target groups with Project Implementation Unit and Head of Public works agency | ||||||||||
| - | To organize delivery of workshop under coordination CPCO and PIU | ||||||||||
| - | To make detail implementation of training included all of training activities | ||||||||||
| - | To monitor and evaluation of training implementation | ||||||||||
| - | To make proceeding and report to project manager | ||||||||||
28 |
Bagian Proyek Pengembangan Sistem Jaringan Prasarana & Sarana Perkotaan Wilayah Barat – Departemen Permukiman dan Prasarana Wilayah |
KU.08.08/PSJPSP-01/05/2002 |
Out Line Planning of Urban Infrastructure System Development at Indralaya Area (South Sumatera) |
- | To make the strategic of urban infrastructure covers water supply, solid waste, waste water, urban road, drainage, public facilities, etc |
|
|
63,843 |
63,843 |
||
| - | To make the strategic of urban infrastructure covers water supply, solid waste, waste water, urban road, drainage, public facilities, etc | ||||||||||
29 |
Ministry of Health DG. Communicable Disease Control and Environmental Health |
HK.02.03.7.295/WSLIC-2/XI/2001 |
Second Water and Sanitation for Low Income Communities (WSLIC~2) Project TF-23692 (Australian Government Grant |
- | Quality of training program for CFS assessed to through monitoring and evaluation CPMU | Nov 16, 2001 |
May 31, 2002 |
105,790 |
84,632 |
||
| - | From logistics facet, executed on schedule and effective cost usage | ||||||||||
| - | Training and report evaluation of work in field and provide information which enough in training execution and improve training program which will come | ||||||||||
| - | Observation effective CFS for support its duty | ||||||||||
30 |
Bag. Pro. Perencanaan Pembinaan Teknis Penyediaan Air Bersih Jl. Pattimura No.20 Kebayoran Baru Jakarta Selatan |
KU.08.08-PTPAB/BT/39/2001 |
Preparation of Benefit Monitoring and Evaluation (BME) and Project Completion Report (PCR) for SUD(s)P ADB Loan No. 138 |
Establish the BME mechanism for the SUDSP in the eight provinces based on existing DGHS BME guidelines. This could be done through a series of workshops at each TK. I using the sample SPAR and allowing each TK. II to conduct the BME activities at their respective project locations; This will require an assessment of the performance achieved by the WJSSCUDP (983/984-INO) which has recently been completed, to establish a consistent platform for the conduct of the BME for the SUDSP (1383-INO); Application of guidelines on BME prepared by DGHS and the design of a BME framework for this project. The design will identify the roles and responsibilities of the various agencies; technical aspects of the BME process, and an implementation schedule; Disseminate DGHS guidelines, baseline data collection criteria; and performance evaluation indicators to the participating local | April 2001 |
July 2002 |
1,149,045 |
689,427 |
|||
31 |
Ministry of Public Works |
BHIP-NK/ SID/002/I/2000 Januari 2000 |
Survey Investigation and Design (SID) on Land Development (LD) and Tertiary Canal (TC) of Batanghari Irrigation Project, Package LCB-6 (LOT-4), under OECF Loan No. IP 478 |
In the effort improvement of food productivity, especially rice, hence government through Irrigation Project West Sumatera, Directorate General Water Resourcer of Department of Public Work, conducting improvement of the quality of rice field through irrigation network development and making of new rice fields (PLB) which have location in Sijunjung District, West Sumatra Province. | 'Jan, 2000 |
'Jan, 2001 |
92,345.68 |
36,938.27 |
|||